Current location:车侣官网>> News>> Company News>>Content

Karleader 3D AVM Installition Process

2016年04月11日   Source:
Karleader 3D AVM Installition Process

1.with dedicated to pry open control

2.disassembling the door 

 

3.Side view camera threading

4.Pry the rearview mirror lens, prepare the borehole camera

5.The backup door installed the line   

6.the front cameras installed line

7.The installation effect  of the front camera

 

 

8.The installation effect  of the side camera

 

9.According to body size, paste calibration tape around the car, the adjustment of the seamless Mosaic

 

10.After meticulous debugging, the control screen shows the seamless Mosaic of 3 d aerial view

 

11.Seamless splicing of 3 d aerial view of a variety of models are optional